Reading the label quote
Expand the project card and you get two halves: the equipment read from the drawing, and the labels that equipment requires.
Equipment
Modules, inverters, batteries and meters, with manufacturer and model where the drawing names them.
Labels
Every label the configuration requires, grouped by where it goes — at the array, at the disconnects, at the service equipment, on the outside of the building.
If something is missing
A label appears because the equipment requiring it was read. A disconnect drawn but never named, or a schedule that is an unreadable image, produces no label. Add it by hand — nothing is locked.
Leaving things out
Individual cards and whole sections can be switched off before you order, for jobs where the customer supplies some of the signage.