User guide → Working a job to sign-off
Chapter 8 of 9
Working a job to sign-off
Every project moves through the same four stages.
1
Permit to construct
Nothing may be built before this.
- Approved
- Awaiting approval
- Corrections requested
2
Install
On the roof.
- Hold
- Confirmed
- Complete
3
Signs ordered
The signs this plan set needs.
- Not ordered
- In production
- Shipped
- Delivered
- Cancelled
4
Inspection
The authority's sign-off.
- Hold
- Booked
- Passed
- Failed

Dates, notes and files
Permit, install and inspection each take a date, a note and attached files — the stamped permit, a photo of the array, a correction notice. Signs ordered takes none of those, because it follows the order.
A project starts at permit approved, because a plan set reaches us
when the installer is going ahead and nobody builds before the permit is granted.