Working a job to sign-off

Every project moves through the same four stages.

1

Permit to construct

Nothing may be built before this.

  • Approved
  • Awaiting approval
  • Corrections requested
2

Install

On the roof.

  • Hold
  • Confirmed
  • Complete
3

Signs ordered

The signs this plan set needs.

  • Not ordered
  • In production
  • Shipped
  • Delivered
  • Cancelled
4

Inspection

The authority's sign-off.

  • Hold
  • Booked
  • Passed
  • Failed
A project laid out around its stages
One project, laid out around the stages.

Dates, notes and files

Permit, install and inspection each take a date, a note and attached files — the stamped permit, a photo of the array, a correction notice. Signs ordered takes none of those, because it follows the order.

A project starts at permit approved, because a plan set reaches us when the installer is going ahead and nobody builds before the permit is granted.